Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields
Gabriel R. Bitran, Thin–Yin Leong
인용
- 주제생산 계획과 일정 · 생산·최적화
We study production planning problems where multiple item categories are produced simultaneously. The items have random yields and are used to satisfy the demands of many products. These products have specification requirements that overlap. An item originally targeted to satisfy the demand of one product may be used to satisfy the demand of other products when it conforms to their specifications. Customers' demand must be satisfied from inventory 100α% of the time. We formulate the problem with service constraints and provide near-optimal solution to the problem with fixed planning horizon. We also propose simple heuristics for the problem solved with a rolling horizon. Some of the heuristics performed very well over a wide range of parameters.
불러오는 중…
- Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
- Ordering and Production Decisions with Supply Quality and Demand Uncertainty
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Deterministic Production Planning: Algorithms and Complexity
- Price-Production Decisions with Deterministic Demand
- Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints
- General Planning Horizons for Production Smoothing with Deterministic Demands
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
- A Class of Deterministic Production Planning Problems
- Pricing and Operational Recourse in Coproduction Systems
- Coproduct Technologies: Product Line Design and Process Innovation
- The Value of Operational Flexibility in the Presence of Input and Output Price Uncertainties with Oil Refining Applications
- Turning Waste into By-Product
- Managing Supply Risk for Vertically Differentiated Co‐Products
- Selling Co‐Products through a Distributor: The Impact on Product Line Design
- Optimal Capacity Conversion for Product Transitions Under High Service Requirements
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
15 / 21편
- Component Commonality with Service Level Requirements
- The Multilocation Multiperiod Inventory Problem: Bounds and Approximations
- A By-Product Production System with an Alternative
- Chance-Constrained Programming with 0-1 or Bounded Continuous Decision Variables
- Constructing Sets of Uniformly Tighter Linear Approximations for a Chance Constraint
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 38(5) · 724–742
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.38.5.724
- 저자Gabriel R. Bitran, Thin–Yin Leong