Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields

Gabriel R. Bitran, Thin–Yin Leong

Management Science

69
피인용
2.7
FWCI
8
IS/마케팅/OM 탑저널 피인용
22
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We study production planning problems where multiple item categories are produced simultaneously. The items have random yields and are used to satisfy the demands of many products. These products have specification requirements that overlap. An item originally targeted to satisfy the demand of one product may be used to satisfy the demand of other products when it conforms to their specifications. Customers' demand must be satisfied from inventory 100α% of the time. We formulate the problem with service constraints and provide near-optimal solution to the problem with fixed planning horizon. We also propose simple heuristics for the problem solved with a rolling horizon. Some of the heuristics performed very well over a wide range of parameters.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보