ms·1973년 7월 1일
Note—A Note on “The Influence of Setup Time on Job Shop Performance” by Wilbrecht and Prescott
인용
4
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제학술논쟁과 논평 · 학술논평
01Abstract
Comments and clarifications about paper [Wilbrecht, J. K., W. B. Prescott. 1969. The influence of setup time on job shop performance. Management Sci. 16 (4, December).].
02연구 흐름
불러오는 중…
03비슷한 논문
- The Influence of Setup Time on Job Shop Performance
- Effects of Setup and Processing Time Reductions on WIP in the JIT Production Systems
- The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling
- Note—A Note on “Critical Ratio Scheduling: An Experimental Analysis”
- Note—A Comparison of Capacity Planning Techniques in a Job Shop Control System
- Simulation of a Simplified Job Shop
- Investing in Reduced Setups in the EOQ Model
- Setup Reduction and Increased Effective Capacity
- Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 19(11) · 1332–1333
- 토픽Consumer Retail Behavior Studies · Marketing
- DOI10.1287/mnsc.19.11.1332
- 저자Sumer C. Aggarwal