The Influence of Setup Time on Job Shop Performance
Jon K. Wilbrecht, William B. Prescott
인용
98
피인용
0.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
A job shop was simulated in order to determine the effect of different job priority rules involving setup times on shop performance. The seven priority rules tested were chosen on the basis that they could be implemented by job shop foremen. Assumptions in the simulation model were based on experience with an electronics company and published literature. The study indicates that, for a fully loaded shop, giving priority to be the job with the shortest actual setup time, regardless of its run time, gives the best overall performance result.
02연구 흐름
불러오는 중…
03비슷한 논문
- Priority Rules for Job Shops with Weighted Tardiness Costs
- Simulation of a Simplified Job Shop
- An Economic Evaluation of Job Shop Dispatching Rules
- The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- Note—A Note on “The Influence of Setup Time on Job Shop Performance” by Wilbrecht and Prescott
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Heuristics in Job Shop Scheduling
- Search and Simulation Selection of a Job-Shop Sequencing Rule
- Operating Policies in Multiechelon Dual-Constraint Job Shops
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 16(4) · B–274
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.16.4.b274
- 저자Jon K. Wilbrecht, William B. Prescott