- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
A quantitative comparison between three types of capacity planning or shop loading techniques is presented. The results were obtained from simulation experiments.
02연구 흐름
불러오는 중…
03비슷한 논문
- Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System
- Simulation of a Simplified Job Shop
- An Integrated Model for Job-Shop Planning and Scheduling
- An Application of the Critical Path Method to Job Shop Scheduling—A Case Study
- Simultaneous Determination of Lot Sizes and Routing Mix in Job Shops
- Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems
- The Influence of Setup Time on Job Shop Performance
- A Dynamic Model for the Optimal Loading of Linear Multi-Operation Shops
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- Search and Simulation Selection of a Job-Shop Sequencing Rule
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 23(9) · 1011–1015
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.9.1011
- 저자Nabil R. Adam, Julius Surkis