Integrated Sequencing and Scheduling in Coil Coating

Wiebke Höhn, Felix G. König, Rolf H. Möhring, Marco E. Lübbecke

Management Science

인용
25
피인용
4.9
FWCI
2
IS/마케팅/OM 탑저널 피인용
27
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks. This can either reduce the number of setups needed or enable setups concurrent with production. A production plan comprises the sequencing of coils and the scheduling of color tanks and setup work. The aim is to minimize the makespan for a given set of coils. We present an optimization model for this integrated sequencing and scheduling problem. A core component is a graph theoretical model for concurrent setup scheduling. It is instrumental for building a fast heuristic that is embedded into a genetic algorithm to solve the sequencing problem. The quality of our solutions is evaluated via an integer program based on a combinatorial relaxation, showing that our solutions are within 10% of the optimum. Our algorithm is implemented at Salzgitter Flachstahl GmbH, a major German steel producer. This has led to an average reduction in makespan by over 13% and has greatly exceeded expectations. This paper was accepted by Dimitris Bertsimas, optimization.

02연구 흐름

불러오는 중…

03비슷한 논문
04이후 연구
05선행 연구

15 / 27편

06서지 정보