IS Atlas
pom·2013년 5월 8일

The Comparison of Two Vertical Outsourcing Structures under Push and Pull Contracts

Yulan Wang, Baozhuang Niu, Pengfei Guo

Production and Operations Management

131
피인용
7.5
FWCI
17
IS/마케팅/OM 탑저널 피인용
36
IS/마케팅/OM 탑저널 참고문헌
01Abstract

In a three‐tier supply chain comprising an original equipment manufacturer (OEM), a contract manufacturer (CM), and a supplier, there exist two typical outsourcing structures: control and delegation. Under the control structure, the OEM contracts with the CM and the supplier respectively. Under the delegation structure, the OEM contracts with the CM only and the CM subcontracts with the supplier. We compare the two outsourcing structures under a push contract (whereby orders are placed before demand is realized) and a pull contract (whereby orders are placed after demand is realized). For all combinations of outsourcing structures and contracts, we derive the corresponding equilibrium wholesale prices, order quantities, and capacities. We find that the equilibrium production quantity is higher under control than under delegation for the push contract whereas the reverse holds for the pull contract. Both the OEM and the CM prefer control over delegation under the push contract. However, under the pull contract, the OEM prefers control over delegation whereas the CM and the supplier prefer delegation over control. We also show that for a given outsourcing structure, the OEM prefers the pull contract over the push contract. In extending our settings to a general two‐wholesale‐price (TWP) contract, we find that when wholesale prices are endogenized decision variables, the TWP contract under our setting degenerates to either a push or a pull contract.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보