- 주제작업장 일정 최적화 · 생산·최적화
This paper considers the problem of determining which jobs, of a specified set, should be done in a given week, and whether or not nonnormal working time arrangements should be used. Such arrangements are more expensive in the sense that plant has to be kept going under undesirable conditions, but, on the other hand, delaying work until the next week will influence the mix of work in that week and hence the economics of operation in that week. There is an interaction between weekly work schedules, which is resolved by means of dynamic programming. The extent of coupling between weeks depends on the extent of overspill from one week to the next. The dynamic programming approach shows how the existence of a small level coupling may be used to reduce the computational load. In very loosely coupled systems the problem reduces to a simple two-stage problem. In uncoupled systems the problem reduces to a single-stage problem.
불러오는 중…
- Dynamic Programming
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- A Dynamic Programming Approach to Stochastic Assembly Line Balancing
- Dynamic Programming and Systems of Uncertain Duration
- On The Computational Solution of Linear Programming Problems Involving Almost-Block-Diagonal Matrices
- Transforming Stochastic Dynamic Programming Problems into Nonlinear Programs
- On the Status of Multistage Linear Programming Problems
- Multi-Echelon Production Scheduling When Demand is Stochastic
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- The Dynamic Line Allocation Problem
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 탑저널 밖 논문
- 저널Management Science · 19(7) · 739–746
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.19.7.739
- 저자D. J. White