01Abstract
The problem considered is that of scheduling the production of several different items over the same facility on a repetitive basis. The facility is such that only one item can be produced at a time; there is a setup cost and a setup time associated with producing each item; the demand rate for each item is known and constant over an infinite planning horizon, and all demand must be met. A dynamic programming solution is developed. This solution is applied to a sample problem, and the results are compared with pertinent bounds.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 12(11) · 778–784
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.12.11.778
- 저자Earl E. Bomberger