01Abstract
A mixed-model manufacturing facility running under a Just-in-Time (JIT) production system is controlled by setting the production sequence of the final assembly process. This sequence is set to achieve the primary goal of an organization operating under a JIT system, which is to maintain a constant rate of part usage. In this paper, a graph-theoretic approach is used to determine an optimal solution for this goal for a new, nonconvex objective function. Furthermore, it is shown that a schedule always exists such that, at all times, the deviation of actual production from the desired level of production for every product is never more than one unit.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 39(6) · 728–735
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.39.6.728
- 저자George Steiner, Scott Yeomans