IS Atlas
ms·1993년 6월 1일

Level Schedules for Mixed-Model, Just-in-Time Processes

George Steiner, Scott Yeomans

Management Science

136
피인용
12.7
FWCI
1
IS/마케팅/OM 탑저널 피인용
10
IS/마케팅/OM 탑저널 참고문헌
01Abstract

A mixed-model manufacturing facility running under a Just-in-Time (JIT) production system is controlled by setting the production sequence of the final assembly process. This sequence is set to achieve the primary goal of an organization operating under a JIT system, which is to maintain a constant rate of part usage. In this paper, a graph-theoretic approach is used to determine an optimal solution for this goal for a new, nonconvex objective function. Furthermore, it is shown that a schedule always exists such that, at all times, the deviation of actual production from the desired level of production for every product is never more than one unit.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보