An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
Management Science
700
피인용
9.0
FWCI
13
IS/마케팅/OM 탑저널 피인용
10
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
An algorithm, computationally feasible for large problems, has been formulated for sequencing n jobs through a single facility to minimize the number of late jobs. This algorithm is then extended to solve the problem in which each job is associated with a continuous, monotone non-decreasing deferral cost function. The object is to produce a schedule where the maximum deferral cost incurred is minimal.