IS Atlas
ms·1967년 10월 1일

Line Balancing-Sequencing for Mixed-Model Assembly

Nick T. Thomopoulos

Management Science

285
피인용
10.1
FWCI
10
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Mixed-model assembly occurs when more than one model of the same general product are intermixed on one assembly line. The amount of work required to assemble units can vary from model to model, creating an uneven flow of work along the line. This paper describes a procedure of adapting single-model line balancing techniques to mixed-model schedules. The paper also introduces a sequencing procedure for determining the order in which models are to flow down the line. Because the line balancing and sequencing procedures consider a wide variety of factors, they are applicable to many types of assembly lines.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보