Sequencing Rules and Due-Date Assignments in a Job Shop
Management Science
496
피인용
16.4
FWCI
14
IS/마케팅/OM 탑저널 피인용
18
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Recent research studies of job shop scheduling have begun to examine the interaction between sequencing priorities and the method of assigning due-dates. This paper surveys the tactical aspects of this interaction, focusing primarily on average tardiness as a measure of scheduling effectiveness. The discussion highlights several factors that can affect the performance of dispatching rules, such as the average flow allowance, the due-date assignment method, and the use of progress milestones. A set of simulation experiments illuminates how these factors interact with the dispatching rule, and the experimental results suggest which combinations are most effective in a scheduling system.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 30(9) · 1093–1104
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.30.9.1093
- 저자Kenneth R. Baker