10
피인용
7.4
FWCI
2
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
- 주제효율성 분석과 자원배분 · 생산·최적화
01Abstract
Formal manpower planning has received increasing attention in recent years. This paper considers the problem of establishing a manpower policy for defined skill categories in the face of uncertain demands. At one extreme an organization might hire and fire personnel as the demand for their services varies over time. Alternatively, the work force might be held constant at a predetermined level and supplemented with overtime or subcontracting when manpower demand exceeds the supply. Models representing these two strategies are developed and compared. Examples are presented to illustrate their economic implications, and several simple rules of thumb are derived to guide manpower policy decisions.
02연구 흐름
불러오는 중…
03비슷한 논문
- Models and Modelling for Manpower Planning
- Aggregation in Manpower Planning
- A Model for Manpower Management
- Input Policies for a Longitudinal Manpower Flow Model
- Some Manpower Planning Models Based on Levels of Educational Attainment
- The Disaggregation of Aggregate Manpower Plans
- A Stochastic Model of Demand Forecasting for Technical Manpower Planning
- Manpower Planning in Hierarchical Organizations: A Computer Simulation Approach
- The Use of Regression Equations to Predict Manpower Requirements
- A Distributed Parameter Cohort Personnel Planning Model That Uses Cross-Sectional Data
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 18(2) · B–19
- 토픽Labor market dynamics and wage inequality · Economics and Econometrics
- DOI10.1287/mnsc.18.2.b19
- 저자David W. Conrath, William F. Hamilton