The Disaggregation of Aggregate Manpower Plans
Larry P. Ritzman, LeRoy J. Krajewski, Michael J. Showalter
인용
- 주제효율성 분석과 자원배분 · 생산·최적화
Aggregate manpower plans can be made operational only if they are translatable into shorter range assignments of personnel to specific work groups, operations, and products or services. This paper describes a combined heuristic programming and simulation algorithm amenable to this process of decomposition. Due to the complexity of the problem and the multiplicity of objectives, optimization techniques are only of academic interest. The algorithm is adapted to a particular environment, namely the construction of tour assignments in a post office. A “tour assignment” specifies simultaneously the exact timing (days and hours) of the work week (shift or tour) as well as the particular job assignment for each employee in the workforce. After describing the problem structure, the algorithm's logic is explained along with the interactive nature of the man-machine approach. Several options can be exercised to combine the power of a computer model with the judgment of the decision maker. The application of this methodology is illustrated with representative data, showing how the search and decision process can be conducted.
불러오는 중…
- Aggregation in Manpower Planning
- Solving Large-Scale Tour Scheduling Problems
- The Economics of Manpower Pooling
- Manpower Planning in Hierarchical Organizations: A Computer Simulation Approach
- A Goal Programming Approach to Aggregate Planning of Production and Work Force
- A Simulation Analysis of Tour-Shift Construction Procedures
- A Model for Manpower Management
- Optimal Disaggregation of Aggregate Production Plans
- Models and Modelling for Manpower Planning
- Dynamic Job Assignment for Railway Personnel
- The Value of Weather Information for E‐Commerce Operations
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Solving Large-Scale Tour Scheduling Problems
- Exact and Approximate Cost Functions for Product Aggregates
- Grammar-Based Integer Programming Models for Multiactivity Shift Scheduling
- Scheduling of Multi‐skilled Staff Across Multiple Locations
- A Linear Programming Approach to Production and Employment Scheduling
- Optimal Programming of Lot Sizes, Inventory and Labor Allocations
- Optimal Disaggregation of Aggregate Production Plans
- Quadratic Inventory Cost Approximations and the Aggregation of Individual Products
- Constrained Inventory Rules for Production Smoothing
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 22(11) · 1204–1214
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.11.1204
- 저자Larry P. Ritzman, LeRoy J. Krajewski, Michael J. Showalter