An approach to decision making under uncertainty is presented and its application to manpower scheduling discussed. The Minimum Risk technique yields an optimum series of manpower levels over a time interval in which the workload (manpower required for each period) is not known. It is assumed that the possible workloads can be described, defined by a finite set of mutually exclusive manpower requirements, and their probabilities can be estimated. Each possible workload is examined and the risk of a particular manpower level is related to the added (transition) cost of performing whatever workload occurs, given this manpower level. The subject technique represents a decision-making tool which has been applied to engineering and scientific personnel planning for over one year. Accordingly, some of the operational aspects of the method are discussed. Linear cost functions and subjective probabilities are used and some practical characteristics of such a formulation are also described.
불러오는 중…
- On a Class of Minimum-Cost Problems
- Risk-Taking in Critical Path Analysis
- Scheduling to Minimize Maximum Workload
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Maximizing the Effectiveness of a Preventive Maintenance System: An Adaptive Modeling Approach
- Input Policies for a Longitudinal Manpower Flow Model
- Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
- The Economics of Manpower Pooling
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- A Stochastic Model of Demand Forecasting for Technical Manpower Planning
- 저널Management Science · 13(10) · B–578
- 토픽Process Optimization and Integration · Control and Systems Engineering
- DOI10.1287/mnsc.13.10.b578
- 저자Roger F. Jewett