24
피인용
1.6
FWCI
1
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Previous authors have shown that dynamic ratio scheduling rules do not always behave as intended. A recent proposal by Adam and Surkis (Adam, N. R., J. Surkis. 1980. Priority update intervals and anomalies in dynamic ratio type job shop scheduling rules. Management Sci. 26 (12, December) 1227–1237.) to correct such anomalies is shown to be in error. The reason why such anomalies occur is clarified and a rule which prevents such anomalies is presented.
02연구 흐름
불러오는 중…
03비슷한 논문
- Priority Update Intervals and Anomalies in Dynamic Ratio Type Job Shop Scheduling Rules
- Note—A Note on “Critical Ratio Scheduling: An Experimental Analysis”
- Priority Scheduling Rules for Repairable Inventory Systems
- Critical Ratio Scheduling: An Experimental Analysis
- The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling
- Sequencing Rules and Due-Date Assignments in a Job Shop
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- Heuristics in Job Shop Scheduling
- Optimal Advance Scheduling
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
04이후 연구
05선행 연구
- Priority Update Intervals and Anomalies in Dynamic Ratio Type Job Shop Scheduling Rules
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 28(11) · 1337–1341
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.28.11.1337
- 저자John J. Kanet