Critical Ratio scheduling has been implemented in job shops that manufacture component parts for stock replenishment as well as direct customer orders. Proponents of this technique argue that scheduling performance is improved by gathering and processing two different types of operating information on a routine basis for use in making priority scheduling decisions: queue waiting time information for individual machines and stock status information from the shop's inventory system. Simulation experiments are reported here which describe the effect on the performance of a shop and its associated inventor' system when using this type of information with an Order Point inventory control system. The results indicate that the additional information provided by the increased data collection and processing functions does not contribute a statistically significant improvement in the overall performance of the production system.
불러오는 중…
- Note—A Note on “Critical Ratio Scheduling: An Experimental Analysis”
- An Application of the Critical Path Method to Job Shop Scheduling—A Case Study
- Focused Scheduling in Proportionate Flowshops
- Note—On Anomalies in Dynamic Ratio Type Scheduling Rules: A Clarifying Analysis
- Capacity Rationing in Multiserver, Nonpreemptive Priority Queues
- Priority Update Intervals and Anomalies in Dynamic Ratio Type Job Shop Scheduling Rules
- Priority Scheduling Rules for Repairable Inventory Systems
- Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System
- A Broader View of the Job-Shop Scheduling Problem
- Priority Scheduling and Spares Stocking Policies for a Repair Shop: The Multiple Failure Case
- Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 22(2) · 192–201
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.2.192
- 저자William L. Berry, Vittal Rao