ms·1977년 10월 1일
Workforce Scheduling with Cyclic Demands and Day-Off Constraints
Kenneth R. Baker, Michael J. Magazine
인용
73
피인용
0.0
FWCI
5
IS/마케팅/OM 탑저널 피인용
2
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
We examine the problem of scheduling days off in continuous (seven-day-a-week) operations under a variety of day-off policies, when demand for manpower is N on weekdays and n on weekend days. We consider a number of policies governing employee work assignments and in each case we give a formula for the minimum workforce size and a schedule construction algorithm.
02연구 흐름
불러오는 중…
03비슷한 논문
- Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
- Work Stretch Properties for the Scheduling of Continuous Operations Under Alternative Labor Policies
- Work Force Size and Single Shift Schedules with Variable Demands
- Multiple-Shift Workforce Scheduling Under the 3–4 Workweek with Different Weekday and Weekend Labor Requirements
- Optimal Scheduiing of Two Consecutive Idle Periods
- Solving Large-Scale Tour Scheduling Problems
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- A Polyhedral Approach for the Staff Rostering Problem
04이후 연구
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Solving Large-Scale Tour Scheduling Problems
- Personnel Tour Scheduling When Starting-Time Restrictions Are Present
- Multiple-Shift Workforce Scheduling Under the 3–4 Workweek with Different Weekday and Weekend Labor Requirements
- Multiple Shift Workforce Lower Bounds
05선행 연구
06서지 정보
- 저널Management Science · 24(2) · 161–167
- 토픽Scheduling and Timetabling Solutions · Management Science and Operations Research
- DOI10.1287/mnsc.24.2.161
- 저자Kenneth R. Baker, Michael J. Magazine