ms·1976년 1월 1일
Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies
William S. Brownell, James M. Lowerre
인용
51
피인용
11.8
FWCI
9
IS/마케팅/OM 탑저널 피인용
2
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
For a seven day a week operation in which N employees are needed on each weekday and n on each weekend day, with N at least as large as n, the effects of time-off policies on the size of the work force are studied. The simplest time-off schedule considered is one in which each employee has two days off out of the week. The most complicated is the policy under which each employee gets even other weekend off, four days off in each two weeks, and all days off in two-day blocks. After the minimum necessary work force has been determined for a policy, it is then shown how any work force meeting the requirement can actually be scheduled.
02연구 흐름
불러오는 중…
03비슷한 논문
- Work Stretch Properties for the Scheduling of Continuous Operations Under Alternative Labor Policies
- Workforce Scheduling with Cyclic Demands and Day-Off Constraints
- Work Force Size and Single Shift Schedules with Variable Demands
- Multiple-Shift Workforce Scheduling Under the 3–4 Workweek with Different Weekday and Weekend Labor Requirements
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
- Optimal Scheduiing of Two Consecutive Idle Periods
- Solving Large-Scale Tour Scheduling Problems
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- A Simulation Analysis of Tour-Shift Construction Procedures
- Frontiers in Operations: When Does Schedule Consistency Improve Shift Worker Productivity?
04이후 연구
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Work Force Size and Single Shift Schedules with Variable Demands
- Workforce Scheduling with Cyclic Demands and Day-Off Constraints
- Unnetworks, with Applications to Idle Time Scheduling
- Work Stretch Properties for the Scheduling of Continuous Operations Under Alternative Labor Policies
- Multiple-Shift Workforce Scheduling Under the 3–4 Workweek with Different Weekday and Weekend Labor Requirements
- A Lagrangean Relaxation Algorithm for the Two Duty Period Scheduling Problem
- A Polyhedral Approach for the Staff Rostering Problem
- Multiple Shift Workforce Lower Bounds
05선행 연구
06서지 정보
- 저널Management Science · 22(5) · 597–605
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.5.597
- 저자William S. Brownell, James M. Lowerre