A Simulation Analysis of Tour-Shift Construction Procedures
Vincent A. Mabert, Charles A. Watts
인용
- 주제작업장 일정 최적화 · 생산·최적화
Work force scheduling research over the last few years has concentrated on the shift scheduling problem in service oriented firms (telephone operators, postal employees, bank encoders, etc.). In all cases, the authors were primarily interested in the evaluating procedures (optimal and heuristic) to determine the appropriate number of workers to be assigned to the available set of work schedules to meet fluctuating work volumes. However, more attention should be given to how the available shift schedules were defined (start times, durations, etc.) and their impact on maintaining good productivity levels. This paper analyzes the impact of six different approaches in defining the available weekly tour-shift schedules. Tests are conducted to evaluate the performance of the six approaches using operating data from Ohio National Bank for the check proof and encoding activity. The results of this study provide some useful managerial insights into the issues of effectively staffing personnel on a weekly basis. First, restrictive employment policies/customs can substantially increase costs. Second, structured procedures can be used to identify and build good employment schedules for a weekly assignment. And third, the structured procedures presented here provide useful cost and productivity information for evaluating various staffing decisions, and weighing these decisions with other intangible factors such as employee morale and turnover.
불러오는 중…
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Solving Large-Scale Tour Scheduling Problems
- A Case Study of Encoder Shift Scheduling under Uncertainty
- Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis
- Multiple-Shift Workforce Scheduling Under the 3–4 Workweek with Different Weekday and Weekend Labor Requirements
- Work Force Size and Single Shift Schedules with Variable Demands
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- The Disaggregation of Aggregate Manpower Plans
- Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System
- Frontiers in Operations: When Does Schedule Consistency Improve Shift Worker Productivity?
- Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
- A Case Study of Encoder Shift Scheduling under Uncertainty
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 28(5) · 520–532
- 토픽Scheduling and Timetabling Solutions · Management Science and Operations Research
- DOI10.1287/mnsc.28.5.520
- 저자Vincent A. Mabert, Charles A. Watts