66
피인용
7.4
FWCI
3
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
This paper studies the problem of scheduling jobs on parallel machines with setup times. When a machine switches from processing one type of job to another type, setup times are incurred. The problem is to find a feasible schedule for each machine which maximizes the total reward. We study three heuristics for solving this problem. Analytical and empirical results of the heuristics are given.
02연구 흐름
불러오는 중…
03비슷한 논문
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- Heuristic Scheduling of Parallel Heterogeneous Queues with Set-Ups
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs
- Batching to Minimize Flow Times on Parallel Heterogeneous Machines
- Heuristics in Job Shop Scheduling
- A Heuristic Procedure for Parallel Sequencing with Choice of Machines
- Scheduling with Multiple Performance Measures: The One-Machine Case
- Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints
- Scheduling Jobs on Two Facilities to Minimize Makespan
04이후 연구
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 36(4) · 467–475
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.36.4.467
- 저자Kut C. So