Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
인용
- 주제작업장 일정 최적화 · 생산·최적화
We consider multimachine scheduling problems with earliness and tardiness costs. We first, analyze problems in which the cost of a job is given by a general nondecreasing, convex function F of the absolute deviation of its completion time from a (common) unrestrictive due-date, and the objective is to minimize the sum of the costs incurred for all N jobs. (A special case to which considerable attention is given is the completion time variance problem.) We derive an easily computable lower bound for the minimum cost value and a simple “Alternating Schedule” heuristic, both of which are computable in O(N log N) time. Under mild technical conditions with respect to F, we show that the worst case optimality (accuracy) gap of the heuristic (lower bound) is bounded by a constant as well as by a simple function of a single measure of the dispersion among the processing times. We also show that the heuristic (bound) is asymptotically optimal (accurate) and characterize the convergence rate as O(N−2) under very general conditions with respect to the function F. In addition, we report on a numerical study showing that the average gap is less than 1% even for problems with 30 jobs, and that it falls below 0.1% for problems with 90 or more jobs. This study also establishes that the empirical gap is almost perfectly proportional with N−2, as verified by a regression analysis. Finally, we generalize the heuristic to settings with a possibly restrictive due date and general asymmetric, and possibly nonconvex, earliness and tardiness cost functions and demonstrate its excellent performance via a second numerical study.
불러오는 중…
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- The Single Machine Early/Tardy Problem
- A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints
- Minimizing Single-Machine Completion Time Variance
- Job Shop Scheduling with Due Dates and Variable Processing Times
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
- Some Heuristics for Scheduling Jobs on Parallel Machines with Setups
- Algoristics for Single-Machine Sequencing with Precedence Constraints
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- On the <i>N</i>-Job One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution
15 / 22편
- Variance Minimization in Single Machine Sequencing Problems
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Note—A Note on the Minimization of Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing Single-Machine Completion Time Variance
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 42(11) · 1544–1555
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.42.11.1544
- 저자Awi Federgruen, Gur Mosheiov