Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints
Management Science
- 주제작업장 일정 최적화 · 생산·최적화
We consider the problem of minimizing the expected makespan of n jobs with independent exponentially distributed processing times on two parallel machines, under resource constraints. Job j has expected processing time 1/μ j and requires throughout its processing an amount r j of a resource; the total amount of resource available is r. In the case where 1/μ 1 < ⋯ < 1/μ n and r 1 < ⋯ < r n , we characterize all the optimal policies in the class of preemptive schedules, and show that the following nonpreemptive policy is optimal: Find the largest k for which r k + r k−1 < r, and start processing jobs k − 1, k. Thereafter, at any job completion, start processing on the machine that is freed, the longest job compatible with the job running on the other machine.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 30(7) · 883–899
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.30.7.883
- 저자Michael Pinedo, Gideon Weiss