Lot-Sizing with Start-Up Times

François Vanderbeck

Management Science

54
피인용
7.5
FWCI
2
IS/마케팅/OM 탑저널 피인용
26
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Many practical applications of lot-sizing and scheduling problems involve start-up times. Operations research literature contains but few studies of lot-sizing models that take start-up times explicitly into account. Here, we review some of these studies, discuss the models and their complexity, and we propose further models. We consider in particular a single-stage single-mode multi-item lot-sizing model with continuous set-ups and sequence independent start-up times, which we solve using an integer programming column generation algorithm and we develop a dynamic programming procedure for the single-item subproblem that treats the initial stock as a decision variable. We also use cutting planes developed by Constantino for the multi-item polyhedra. By combining column and cut generation, the lower bounds that we obtain before branching are on average less than 2% from an optimal solution. Our algorithm solves instances with 3 to 5 items and 24 periods in an average of 50 seconds on a modern workstation, and problems with 36 periods in an average of 750 seconds. Solutions guaranteed to be within 2% of optimality are obtained in less than 75% of these times.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보