81
피인용
5.0
FWCI
3
IS/마케팅/OM 탑저널 피인용
9
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Consider an assembly line balancing problem with stochastic task times. Our objective is to find a grouping of tasks into stations that satisfies all precedence relations and minimizes the number of stations, subject to the constraint that the probability that the resulting station work content at each station is no more than the given cycle time is bounded by a given value. Similar to Held and Karp's approach, we formulate the problem in dynamic programming. The solution procedure is based on Mitten's preference order dynamic programming
02연구 흐름
불러오는 중…
03비슷한 논문
- A Dynamic Programming Approach to Stochastic Assembly Line Balancing
- Analysis of a Preference Order Assembly Line Problem
- A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities
- An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem
- Sequencing for Assembly Lines with Integer Task Times
- Assembly Line Balancing with Processing Alternatives: An Application
- Assembly Line Balancing with Multiple Stations
- Assembly Line Balancing Using Probabilistic Combinations of Heuristics
- A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages
- Sequencing to Minimize Work Overload in Assembly Lines with Product Options
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 22(10) · 1097–1104
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.10.1097
- 저자Edward P. C. Kao