IS Atlas
ms·1991년 5월 1일

Sequencing to Minimize Work Overload in Assembly Lines with Product Options

Candace Arai Yano, Ram Rachamadugu

Management Science

222
피인용
10.4
FWCI
4
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We address the problem of sequencing jobs, each of which is characterized by one of a large number of possible combinations of customer-specified options, on a paced assembly line. These problems arise frequently in the automotive industry. One job must be launched into the system at equal time intervals, where the time interval (or cycle time) is prespecified. The problem is to sequence the jobs to maximize the total amount of work completed, or equivalently, to minimize the total amount of incomplete work (or work overload). Since there is a large number of option combinations, each job is almost unique. This fact precludes the use of existing mixed model assembly line sequencing techniques. We first consider the sequencing problem for a single station which can perform two different sets of operations. We characterize the optimal solution for this problem and use the results as the basis for a heuristic procedure for multiple stations. Computational results with data from a major automobile company are reported.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보