IS Atlas
ms·1986년 4월 1일

Safety Stocks in MRP—Systems with Emergency Setups for Components

Robert Carlson, Candace A. Yano

Management Science

43
피인용
5.9
FWCI
2
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Material Requirements Planning or Manufacturing Resource Planning (MRP) systems originally were designed for a deterministic environment. Often, however, demand for finished products is uncertain and some type of buffering mechanism is necessary to provide desired levels of service. When the schedule is replanned each period, as typically is done, variability of demand may manifest itself in the form of early or “emergency” production runs. Safety stock may serve to avert some or most of these emergency production runs. We have developed a heuristic algorithm which is shown to provide extremely good guidelines for setting safety stock levels.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보