Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization
Simon Thevenin, Yossiri Adulyasak, Jean‐François Cordeau
Production and Operations Management
인용
- 주제생산 계획과 일정 · 생산·최적화
- 방법
- 현상
Material Requirements Planning (MRP), a core component of enterprise resource planning (ERP) systems, is widely used by manufacturers to determine the production lot sizes of components. These lot sizes are typically computed based on deterministic and dynamic demand assumptions, while safety stocks, which hedge against demand uncertainty, are determined independently based on different assumptions. As the lot sizes and safety stocks are not determined simultaneously, sub‐optimal decisions are often used in practice. The critical impact of inventories and service levels in manufacturing motivates the study of stochastic optimization methods for MRP. In this study, we investigate stochastic optimization methods for MRP systems under demand uncertainty. A two‐stage and a multi‐stage model are proposed to deal with the static‐static and static‐dynamic decision frameworks, respectively. We first derive structural properties of the two‐stage and multi‐stage models to provide insights on the differences between the plans created with these two models. As multi‐stage stochastic programs are not convenient in real‐world applications, several practical enhancements are proposed. First, to address scalability issues, we employ heuristics in combination with advanced sampling methods. Second, to allow real‐time static‐dynamic decisions, we derive a policy from the solution of the multi‐stage model. Third, to deal with the dynamic‐dynamic decision framework, we employ a rolling horizon implementation. The effectiveness and performance of stochastic optimization for MRP are validated by numerical experiments, which demonstrate that the stochastic optimization approaches have the potential to generate significant cost savings compared to traditional methods for production planning and safety stocks determination.
불러오는 중…
- MRP Planned Orders in a Multiple‐Supplier Environment with Differing Lead Times
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Safety Stocks in MRP—Systems with Emergency Setups for Components
- Dynamic stochastic lot sizing with forecast evolution in rolling‐horizon planning
- Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
- Optimal Use and Replenishment of Two Substitutable Raw Materials in a Stochastic Capacitated Make-to-Order Production System
- Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems
- Optimizing Resource Acquisition Decisions by Stochastic Programming
- Assemble‐to‐Order Inventory Management via Stochastic Programming: Chained BOMs and the M‐System
- A Comparison of Strategies to Dampen Nervousness in MRP Systems
- When preemptive risk mitigation is insufficient: The effectiveness of continuity and resilience techniques during COVID‐19
- Crossing Minimal Edge‐Constrained Layout Planning using Benders Decomposition
- Dynamic stochastic lot sizing with forecast evolution in rolling‐horizon planning
- Production Planning with Markovian Production Relationships
15 / 47편
- Computational Complexity of the Capacitated Lot Size Problem
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Distributionally Robust Optimization of Two‐Stage Lot‐Sizing Problems
- Multistage Stochastic Optimization for Production‐Inventory Planning with Intermittent Renewable Energy
- Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints
- Safety Stocks in MRP—Systems with Emergency Setups for Components
- Stabilized‐Cycle Strategy for Capacitated Lot Sizing with Multiple Products: Fill‐Rate Constraints in Rolling Schedules
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Production and Operations Management · 30(2) · 475–493
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1111/poms.13277
- 저자Simon Thevenin, Yossiri Adulyasak, Jean‐François Cordeau