IS Atlas
ms·1994년 12월 1일

Safety Stock versus Safety Time in MRP Controlled Production Systems

John A. Buzacott, J. George Shanthikumar

Management Science

153
피인용
0.6
FWCI
7
IS/마케팅/OM 탑저널 피인용
17
IS/마케팅/OM 탑저널 참고문헌
01Abstract

The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time and the degree of congestion, together with the costs of inventory and shortages. These influences are explored using stochastic models of a single stage manufacturing system for which work release is controlled using MRP. The major conclusion is that safety time is usually only preferable to safety stock when it is possible to make accurate forecasts of future required shipments over the lead time, otherwise safety stock is more robust in coping with changes in customer requirements in the lead time or with fluctuations in forecasts of lead time demand.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보