An exploratory study was conducted (a) to examine whether experienced software managers could generate accurate estimates of effort required for proposed software projects and (b) to document the strategies they bring to bear in their estimations. Five experienced software project managers served as expert subjects for the study. Each manager was first asked to sort a set of 37 commonly-used estimation parameters according to the importance of their effect on effort estimation. Once this task was completed, the manager was then presented with data from ten actual software projects, one at a time, and asked to estimate the effort (in worker-months) required to complete the projects. The project sizes ranged from 39,000 to 450,000 lines of code and varied from 23 to 1,107 worker-months to complete. All managers were tested individually. The results were compared to those of two popular analytical models-Function Points and COCOMO. Results show that the managers made more accurate estimates than the uncalibrated analytical models. Additionally, a process-tracing analysis revealed that the managers used two dissimilar types of strategies to solve the estimation problems—algorithmic and analogical. Four managers invoked algorithmic strategies, which relied on the selection of a base productivity rate as an anchor that was further adjusted to compensate for productivity factors impacting the project. The fifth manager invoked analogical strategies, which did not rely on a base productivity rate as an anchor, but centered around the analysis of the Function Point data to assist in retrieving information regarding a similar, previously-managed project. The manager using the latter, analogical reasoning approach produced the most accurate estimates.
불러오는 중…
- Examining the Feasibility of a Case-Based Reasoning Model for Software Effort Estimation
- Decomposed Versus Holistic Estimates of Effort Required for Software Writing Tasks
- Performance Evaluation of General and Company Specific Models in Software Development Effort Estimation
- Programmer and Analyst Time/Cost Estimation
- An Examination of Some Software Development Effort and Productivity Determinants in ICASE Tool Projects
- An Experimental Analysis of Network Planning
- Subjective Estimates and Scheduling Decisions
- Software Cost Estimation Using Economic Production Models
- Information System Cost Estimating: A Management Perspective
- A Model to Evaluate Variables Impacting the Productivity of Software Maintenance Projects
- Examining the Feasibility of a Case-Based Reasoning Model for Software Effort Estimation
- Software Cost Estimation Using Economic Production Models
- Decomposed Versus Holistic Estimates of Effort Required for Software Writing Tasks
- Early to Adopt and Early to Discontinue: The Impact of Self-Perceived and Actual IT Knowledge on Technology Use Behaviors of End Users
- Managers' Judgments of Performance in IT Services Outsourcing
15 / 20편
- A Model to Evaluate Variables Impacting the Productivity of Software Maintenance Projects
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Information Systems Research · 2(4) · 243–262
- 토픽Software Engineering Research · Information Systems
- DOI10.1287/isre.2.4.243
- 저자Steven S. Vicinanza, Tridas Mukhopadhyay, Michael J. Prietula