This study (1) tests some basic hypotheses related to the use of historical estimating behavioral information in network planning, and (2) makes comparative evaluations of a number of network planning techniques. Since a number of previous studies have evaluated similar hypotheses and techniques to a limited degree using data from real-world projects, this study utilizes a laboratory experiment as a means of generating data which have a richer potential for analysis. Although the results are not conclusive, the study further suggests the potential value of using historical estimating behavior as a basis for “adjusting” the single time estimates made by an individual or group and/or using a single-estimate simulation approach rather than using a multiple estimate approaches such as PERT.
불러오는 중…
- On the Analysis of Critical Path Time Estimating Behavior
- Subjective Time Estimates in Critical Path Planning—A Preliminary Analysis
- Software-Effort Estimation: An Exploratory Study of Expert Performance
- Subjective Estimates and Scheduling Decisions
- An Experimental Comparison of the Effectiveness of Three Planning Methods
- The Efficiency of the Price, Budget, and Mixed Approaches Under Varying <i>a Priori</i> Information Levels for Decentralized Planning
- Communication to the Editor—The Use of Subjective Probability Estimates in Assessing Project Completion Times
- Some Experiments in Planning and Operating
- Capacity planning with limited information
- R&D Project Planning with <i>Q</i>-GERT Network Modeling and Simulation
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- Subjective Time Estimates in Critical Path Planning—A Preliminary Analysis
- On the Analysis of Critical Path Time Estimating Behavior
- Bias in Pert Project Completion Time Calculations for a Real Network
- Free For All—Guest Editorial: L'Histoire de Grandeur et de la Dćadence de la Méthode PERT
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 19(12) · 1423–1432
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.19.12.1423
- 저자William R. King, Paul Andre Lukas