- 주제소프트웨어 개발관리 · 디지털조직
01Abstract
The ability to estimate the personnel time and costs required for the completion of programming and systems projects is an important managerial tool for the information systems department. This article presents a survey of the estimation techniques found in the literature by describing each technique and discussing its strengths and weaknesses. Some empirical evidence on how the various program and programmer/ analyst characteristics affect project time and cost are also reported.
02연구 흐름
불러오는 중…
03비슷한 논문
- Information System Cost Estimating: A Management Perspective
- Software-Effort Estimation: An Exploratory Study of Expert Performance
- A Linear Model Approach to Time and Cost Analysis
- Time Is Relative: How Framing of Time Estimation Affects the Accuracy of Cost Information
- Subjective Time Estimates in Critical Path Planning—A Preliminary Analysis
- The Role of Programming Language in Estimating Software Development Costs
- Decomposed Versus Holistic Estimates of Effort Required for Software Writing Tasks
- On the Analysis of Critical Path Time Estimating Behavior
- A Simple CPM Time-Cost Tradeoff Algorithm
- Communication to the Editor—The Use of Subjective Probability Estimates in Assessing Project Completion Times
04이후 연구
- Examining the Feasibility of a Case-Based Reasoning Model for Software Effort Estimation
- The Effects of Using a Nonprocedural Computer Language on Programmer Productivity
- MCDM Approach for Generating and Evaluating Alternatives in Requirement Analysis
- A Model for Measuring Information System Size
- Information System Cost Estimating: A Management Perspective
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널MIS Quarterly · 4(2) · 31–43
- 토픽Software Engineering Research · Information Systems
- DOI10.2307/249335
- 저자Izak Benbasat, Iris Vessey