Capacity planning with limited information

Vic Anand, Ramji Balakrishnan, Srinagesh Gavirneni

Production and Operations Management

3
피인용
1.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
24
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Limited information about the demand for some of the resources needed to produce goods and services (e.g., incomplete and imperfect bills of materials) forces firms to use heuristics when planning resource capacity. We examine the performance of five heuristics: two drawn from practice, two that modify observed approaches, and one motivated by theory. We measure performance as the ratio of the expected cost of supply–demand mismatch from using a heuristic to the value in the full‐information solution. Numerical analysis shows that a simple heuristic that is common in practice—plan rigorously for a few “driver” resources with high‐quality information and use ratios (e.g., 0.25 indirect labor hours per machine hour) to project the capacities for the remaining “non‐driver” resources—is robust and efficient. Using more than one driver resource to plan for the same non‐driver resource delivers significant gains. Reducing measurement error with respect to the consumption of driver resources dominates the gain from reducing errors in other aspects. Indeed, with high measurement error, collecting information that reduces other sources of error could decrease overall performance. Finally, a greedy algorithm of choosing the most expensive resources as drivers is optimal.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보