Present PERT-type scheduling models implicitly assume unlimited availability of resources. As most project schedulers are aware, however, activities may be constrained in their start dates by availability of resources as well as by technological orderings. Analytic solutions to the limited-resource, project scheduling problem are infeasible at present for all but small projects; heuristic approaches seem most promising of useful results. One such approach, described here, is a computer model capable of scheduling single or multiple projects within resource limits and other constraints commonly encountered by the project scheduler. The basic formulation of the model is discussed along with its scheduling heuristics which determine the period-by-period allocation of resources to activities in a project. By changing certain parameters and heuristics in the model, one can simulate project scheduling under varying constraints and scheduling rules. Applications of the model to a number of fictitious and real projects are described.
불러오는 중…
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Project Scheduling Under Partially Renewable Resource Constraints
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Heuristic Scheduling of Activities under Resource and Precedence Restrictions
- Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- Scheduling of Project Networks by Job Assignment
- Heuristic Scheduling of Activities under Resource and Precedence Restrictions
- A General Framework for Modeling Production
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- Comparison of a Multi-Pass Heuristic Decomposition Procedure with Other Resource-Constrained Project Scheduling Procedures
- A Heuristic Approach to Solving Travelling Salesman Problems
- Summary of a Heuristic Line Balancing Procedure
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 13(6) · B–359
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.13.6.b359
- 저자Jerome D. Wiest