An Application of the Critical Path Method to Job Shop Scheduling—A Case Study

William A. Heuser, B. E. Wynne

Management Science

2
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Small and medium-sized job shops are often run with little or no production scheduling. As the number and complexity of jobs increases, management finds it increasingly difficult to control costs and still maintain delivery dates. In order to provide management with the needed control, some practical scheduling system is needed. This case study describes the installation, in a medium-sized tool shop, of such a system based on CPM and operated manually. Emphasis is placed on the problems of converting CPM into a continuing, working system under the manual operation of shop scheduling personnel. Much of the value of CPM in the final system is its use as a “one-shot” analytical tool to aid in the production of a shop schedule. An unusual feature of the system is that it provides a method for the routine scheduling of two critical manpower resources in a multiple-network situation. Management Technology, ISSN 0542-4917, was published as a separate journal from 1960 to 1964. In 1965 it was merged into Management Science.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보