IS Atlas
ms·1966년 10월 1일

Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System

Michael H. Bulkin, John L. Colley, Harry W. Steinhoff

Management Science

55
피인용
9.6
FWCI
4
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper reports the development, installation and evaluation of a simulation which sequences shop operations for the next shift. Simulation outputs give each foreman the priority of jobs currently in his section and those jobs which might be coming through his area during the next work period. The foreman can determine in advance what tools, raw materials, etc., are needed and obtain them, thus tending to eliminate queue time for hot jobs. In three months of operation, the simulation has been more successful than initially expected. Coordination and expediting efforts have been reduced, in-process inventory has been reduced along with worker idle time, and schedule performance has improved. An additional important result noted during this time is an enlargement of the foreman's job. He has less need for coordinators and expediters since he has the information needed to make rational decisions on sequencing the work. This effort illustrates the practicality and desirability of incorporating advanced concepts into operating systems if the system's demands on working personnel are made compatible with the objectives and capabilities of the workers.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보