A Broader View of the Job-Shop Scheduling Problem
Lawrence M. Wein, Philippe Chévalier
인용
- 주제작업장 일정 최적화 · 생산·최적화
We define a job-shop scheduling problem with three dynamic decisions: assigning due-dates to exogenously arriving jobs, releasing jobs from a backlog to the shop floor, and sequencing jobs at each of two workstations in the shop. The job-shop is modeled as a multiclass queueing network and the objective is to minimize both the work-in-process (WIP) inventory on the shop floor and the due-date lead time (due-date minus arrival date) of jobs, subject to an upper bound constraint on the proportion of tardy jobs. A general two-step approach to this problem is proposed: (1) release and sequence jobs in order to minimize the WIP inventory subject to completing jobs at a specified rate, and (2) given the policies in (1), set due-dates that will attempt to minimize the due-date lead time, subject to the job tardiness constraint. A simulation study shows that this approach easily outperforms other combinations of traditional due-date setting, job release, and priority sequencing policies for two cases (moderately loaded and heavily loaded) of a particular shop. As a result of the study, three scheduling principles are proposed that can significantly improve the performance of a two-station job-shop; in particular, better due-date performance can be achieved by ignoring due-dates on the shop floor. Although we have only considered a two-station shop, the approach and scheduling principles presented here might also be useful for larger shops.
불러오는 중…
- Alternative Formulation of the Job Shop Problem with Due Dates
- Heuristics in Job Shop Scheduling
- Sequencing Rules and Due-Date Assignments in a Job Shop
- The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling
- Job Shop Scheduling with Due Dates and Overtime Capability
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- Note. Satisfying Due Dates in Large Job Shops
- A Methodology for Assigning Minimum Cost Due-Dates
- Due-Dates and Instantaneous Load in the One-Machine Shop
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- Customer-Order Information, Leadtimes, and Inventories
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- Single Facility Due Date Setting with Multiple Customer Classes
- Heuristic Scheduling of Parallel Heterogeneous Queues with Set-Ups
- Optimal Lead Time Policies
- Addressing distributional shifts in operations management: The case of order fulfillment in customized production
- ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling
15 / 40편
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- Purchasing Priorities in Queues
- A Simulation Study of Predictable Due-Dates
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- Note—Lot-Sizing and Sequencing Delays
- An Economic Evaluation of Job Shop Dispatching Rules
- Priority Rules for Job Shops with Weighted Tardiness Costs
- Scheduling with Multiple Performance Measures: The One-Machine Case
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 38(7) · 1018–1033
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.38.7.1018
- 저자Lawrence M. Wein, Philippe Chévalier