- 주제생산 계획과 일정 · 생산·최적화
01Abstract
In this paper we present a mathematical programming model for the Kanban system in a deterministic multi-stage capacitated assembly-tree-structure production setting. We discuss solution procedures to the problem and address three special cases of practical interest.
02연구 흐름
불러오는 중…
03비슷한 논문
- Kanban Controlled Pull Systems: An Analytic Approach
- Structural Properties and a Heuristic for Kanban-Controlled Serial Lines
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Analysis of a Kanban Discipline for Cell Coordination in Production Lines. I
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Note—On Madigan's Approach to the Deterministic Multi-Product Production and Inventory Problem
- A Dynamic Programming Approach to Stochastic Assembly Line Balancing
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Coordinated Contract Decisions in a Make‐to‐Order Manufacturing Supply Chain: A Stochastic Programming Approach
- A Production Scheduling Model by Bivalent Linear Programming
04이후 연구
05선행 연구
- Multi-Stage Production Planning
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 33(4) · 427–441
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.33.4.427
- 저자Gabriel R. Bitran, Chang Li