ms·1962년 1월 1일
Stochastic Scheduling by the Horizon Method
Management Science
12
피인용
5.5
FWCI
1
IS/마케팅/OM 탑저널 피인용
13
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
The stochastic scheduling problem discussed in this paper is similar to the classical inventory model. It is concerned with the demand for a single commodity expressed as a set of independent stochastic variables with known distributions and an objective functional composed of production and inventory cost variables. The model, however, incorporates a uniquely determined planning horizon, and in the usual application requires only a finite number of time periods. The horizon period is based upon the minimum expected loss in the operation and therefore is subject to the stochastic variables of demand.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 8(2) · 138–167
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.8.2.138
- 저자Gifford H. Symonds