A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
Robert C. Dorsey, Thom J. Hodgson, H. Donald Ratliff
인용
- 주제생산 계획과 일정 · 생산·최적화
A multi-product, multi-facility production scheduling problem is considered over a finite planning horizon. The horizon consists of discrete production periods during each of which at most one product can be assigned to each facility. Product demand rates are assumed to be constant over a period but not necessarily identical in all periods. All demands must be met without allowing backorders. The problem objective is to determine an assignment of products to facilities over the horizon which minimizes the sum of production and inventory carrying charges. The problem is formulated as a network flow problem for which efficient solution procedures are known. However, for an important special case a single pass algorithm is given which is more efficient than the standard flow algorithms.
불러오는 중…
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- A Hybrid Algorithm for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures
- Demand Allocation in Multiple-Product, Multiple-Facility, Make-to-Stock Systems
- Scheduling Economic Lot Size Production Runs
- Solution of a Multi-Product Manufacturing and Distribution Problem
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- Multi-Echelon Production Scheduling When Demand is Stochastic
- A Production Scheduling Problem with Sequencing Considerations
- Multi-Product Scheduling in a Chemical Plant
- Optimal Policy for a Multi-Product, Dynamic, Nonstationary Inventory Problem
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- Addendum to Stankard and Gupta's Note on Lot Size Scheduling
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 21(7) · 813–822
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.7.813
- 저자Robert C. Dorsey, Thom J. Hodgson, H. Donald Ratliff