Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
인용
- 주제생산 계획과 일정 · 생산·최적화
This paper develops rolling horizon procedures for solving a multistage inventory problem with facilities-in-series. In such an inventory system, we assume that the raw material is processed successively through several facilities before reaching the customer. The input to a facility comes from one preceding facility (or the raw material) and the output from the facility goes to one succeeding facility (or the customer). The rolling horizon procedures form rolling production schedules by solving a finite horizon multiperiod problem and implementing only the first period's decisions. One period later, the multiperiod problem is updated as better forecasts become available and the process is repeated. The paper considers a simple case when holding costs are linear, production costs on a facility consist of a setup cost and a constant marginal cost of production, and production and holding costs are stationary in time. Demand is allowed to be nonstationary in time. Several rolling horizon procedures are developed for this case and a computational comparison is given.
불러오는 중…
- A Facilities in Series Inventory Model with Nested Schedules
- Stochastic Scheduling by the Horizon Method
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- An Analytic Framework for Evaluating Rolling Schedules
- The Nonstationary Infinite Horizon Inventory Problem
- Turnpike Horizons for Production Planning
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Multi-Stage Production Planning
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Scheduling the Production of Several Items with Random Demands in a Single Facility
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Facilities in Series Inventory Model with Nested Schedules
- Minimum Concave Cost Flows in Certain Networks
- An Analytic Framework for Evaluating Rolling Schedules
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 29(2) · 237–249
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.29.2.237
- 저자Suresh Chand