ms·1978년 12월 1일
Note—On “Further Results on Planning Horizons in the Production Smoothing Problem”
Robert Evan Johnson, John O. McClain
인용
6
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제논평과 정정 · 생산·최적화
01Abstract
Notes on paper [Lee, D. R., D. Orr. 1977. Further results on planning horizons in the production smoothing problem. Management Sci. 23 (5) 490–498.] pointing to some ambiguities and errors.
02연구 흐름
불러오는 중…
03비슷한 논문
- Further Results on Planning Horizons in the Production Smoothing Problem
- General Planning Horizons for Production Smoothing with Deterministic Demands
- Planning Horizons for Production Smoothing with Deterministic Demands
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
- An Extension to Modigliani and Hohn's Planning Horizons Results
- On Production Smoothing
- Note—On “A New Look at Production Switching Heuristics for the Aggregate Planning Problem”
- A Note on the Modigliani-Hohn Production Smoothing Model
- Production Smoothing with Stochastic Demand II: Infinite Horizon Case
- Stochastic Horizons for the Aggregate Planning Problem
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 24(16) · 1774–1776
- 토픽Optimization and Mathematical Programming · Control and Systems Engineering
- DOI10.1287/mnsc.24.16.1774
- 저자Robert Evan Johnson, John O. McClain