01Abstract
The division of labor in assembly is facilitated by the conveyor line. Workers are stationed along the line on which the frame of the product being assembled moves. The total job is broken into elements of work and assigned in approximately equal shares to the workers on the line. Each operator adds his share of work as the product passes him. The measure of the division of labor is the amount of time the product spends at each operator's work station. This period is commonly called the “cycle time.” The problem of the economic extent of the division of labor is to determine the optimum cycle time, or that which yields the lowest unit direct labor cost of assembly.
02연구 흐름
불러오는 중…
03비슷한 논문
- Assembly Line Balancing with Processing Alternatives: An Application
- Sequencing to Minimize Work Overload in Assembly Lines with Product Options
- Optimal Allocation of Work in Assembly Systems
- Summary of a Heuristic Line Balancing Procedure
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- The Labor Assignment Decision and Application of Work Flow Structure Information
- The Balance Delay Problem
- Parallel Line Assignment Problems
- Sequencing for Assembly Lines with Integer Task Times
- A Linear Model Approach to Time and Cost Analysis
04이후 연구
05선행 연구
- The Balance Delay Problem
- A Model for Industrial Learning Costs
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 12(6) · B–255
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.12.6.b255
- 저자Maurice D. Kilbridge, Leon Wester