IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Balance delay time is the amount of idle time on production assembly lines caused by the uneven division of work among operators or stations. It is related to the extent and way the total task is subdivided. In this paper the problem of balance delay is treated empirically and analytically. Empirical studies show that high balance delay is associated with a wide range of work-element times and a high degree of line mechanization. The analytical study yields a general algebraic method of minimizing balance delay by the appropriate choice of cycle times. Balance delay functions are drawn and the condition of perfect balance is shown to coincide with the zero points of these functions.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 8(1) · 69–84
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.8.1.69
- 저자Maurice D. Kilbridge, Leon Wester