Systems analyses frequently require estimates of the average time that it takes to perform repetitive tasks. These time estimates may be easy to obtain; for example, if one man is performing a single operation, then a simple division of his total working time by the frequency of the task repetition, gives an estimate of the average performance time. However, in many instances, work consolidation requires that individuals be called upon to perform several different operations. For example, crews may be sent into the field to carry out a number of different tasks, for which the relative rate of occurrence may change from day to day. This introduction of multiple operations implies that the required separate time estimates can no longer be obtained by a simple division. This paper discusses linear model estimation of the average time taken to perform specific tasks; the estimation is possible even when a number of different tasks are performed by an individual or group. The models are based on the conceptual relation that the time taken to perform a task multiplied by the rate of occurrence in the considered time period, and summed over all possible tasks, should equal the total time taken by all tasks. Estimation is also possible when direct observations are difficult to obtain (as in stopwatch procedures) because the proposed models do not require direct time observations but rather utilize linear combinations of the individual time parameters. An actual application is discussed.
불러오는 중…
- Time Is Relative: How Framing of Time Estimation Affects the Accuracy of Cost Information
- Programmer and Analyst Time/Cost Estimation
- An Activity Analysis Approach to Unit Costing with Multiple Interactive Products
- An Example and a Proposal Concerning the Correlation of Worker Processing Times in Parallel Tasks
- On the Analysis of Critical Path Time Estimating Behavior
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time
- Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems
- Subjective Time Estimates in Critical Path Planning—A Preliminary Analysis
- An Economic Model for the Division of Labor
아직 이 논문을 인용한 탑저널 논문이 없습니다.
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
- 저널Management Science · 12(6) · B–216
- 토픽Transport Systems and Technology · Mechanical Engineering
- DOI10.1287/mnsc.12.6.b216
- 저자William Howard Williams