ms·1974년 9월 1일
A Production Scheduling Problem with Sequencing Considerations
Management Science
38
피인용
4.2
FWCI
1
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
A type of production scheduling problem with sequencing considerations existing in several manufacturing facilities in chemical industry is formulated as a mixed integer programming problem and solved using a branch and bound search algorithm. The problem has two unusual sequencing aspects, namely, (1) a product to be sequenced can be split up amongst the reactors which, described in sequencing literature as job-splitting, is not usually allowed in machine sequencing problems and (2) the number of products to be sequenced on a given equipment as well as the product sequence need to be simultaneously determined. Some computational experience is reported.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 21(1) · 34–42
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.1.34
- 저자T. V. Prabhakar