38
피인용
4.1
FWCI
1
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
A type of production scheduling problem with sequencing considerations existing in several manufacturing facilities in chemical industry is formulated as a mixed integer programming problem and solved using a branch and bound search algorithm. The problem has two unusual sequencing aspects, namely, (1) a product to be sequenced can be split up amongst the reactors which, described in sequencing literature as job-splitting, is not usually allowed in machine sequencing problems and (2) the number of products to be sequenced on a given equipment as well as the product sequence need to be simultaneously determined. Some computational experience is reported.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Production Scheduling Model by Bivalent Linear Programming
- Multi-Product Scheduling in a Chemical Plant
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- Lot Sizing and Sequencing for <i>N</i> Products on One Facility
- Scheduling Economic Lot Size Production Runs
- Three Heuristic Rules for Sequencing Jobs to a Single Production Facility
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Batching to Minimize Flow Times on One Machine
- Integrated Scheduling of Production and Distribution Operations
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
04이후 연구
05선행 연구
- Integer Programming Algorithms: A Framework and State-of-the-Art Survey
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 21(1) · 34–42
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.1.34
- 저자T. V. Prabhakar