Details are given of a chemical plant consisting of four machines, each capable of producing one of several products at a time. Five products are to be produced, each subject to a normal demand distribution with known parameters. The rates of production, costs, profit margins, setup times and machine capacities are given. The study compares two production scheduling methods, the first (Method I) is based on linear programming (two variants of this method are considered) and the second (Method II) on a multi-product batch scheduling approach. A simulation of the plant for a variety of demand conditions and for several safety-stock policies was carried out. The results suggest that Method I yields somewhat better plant performance for the case when average demand is below plant capacity, but neither method showed superiority under all conditions, and in many cases the difference between the results for the two methods was only marginal.
불러오는 중…
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- A Production Scheduling Problem with Sequencing Considerations
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- Multiproduct Production Scheduling for Style Goods with Limited Capacity, Forecast Revisions and Terminal Delivery
- Scheduling Economic Lot Size Production Runs
- Lot Size Scheduling on a Single Machine for Stochastic Demand
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- 탑저널 밖 논문
- 저널Management Science · 15(6) · B–267
- 토픽Process Optimization and Integration · Control and Systems Engineering
- DOI10.1287/mnsc.15.6.b267
- 저자Samuel Eilon