Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
Anthony J. Zahorik, William W. Trigeiro
Management Science
- 주제생산 계획과 일정 · 생산·최적화
This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems—one in which the constraint was on shipping capability and one in which there was a final stage bottleneck machine—motivated the paper. A multi-item facilities-in-series problem is formulated, in standard fashion, as a linear program. Then we show that in certain important cases the 3-period problem is a network problem. This 3-period result is used as the basis for a rolling heuristic for T-period problems. The conditions under which this heuristic fails to find optimal solutions are discussed and computational comparisons to standard linear programming are given. Finally, we discuss ways of dealing with two constrained facilities and with setup costs.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 30(3) · 308–325
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.30.3.308
- 저자Anthony J. Zahorik, William W. Trigeiro