IS Atlas
ms·1984년 3월 1일

Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems

Anthony J. Zahorik, William W. Trigeiro

Management Science

69
피인용
5.9
FWCI
8
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems—one in which the constraint was on shipping capability and one in which there was a final stage bottleneck machine—motivated the paper. A multi-item facilities-in-series problem is formulated, in standard fashion, as a linear program. Then we show that in certain important cases the 3-period problem is a network problem. This 3-period result is used as the basis for a rolling heuristic for T-period problems. The conditions under which this heuristic fails to find optimal solutions are discussed and computational comparisons to standard linear programming are given. Finally, we discuss ways of dealing with two constrained facilities and with setup costs.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보