This paper deals with the classical dynamic lot size problem without backlogging and capacity limitation. We derive worst case performance bounds for a class of lot sizing heuristics. When the considered methods are applied a decision whether to have a set-up or not in a certain period is taken without regarding the future demand. It is shown that 2 is a lower bound for the worst case performance ratio for such heuristics. The results illustrate circumstances under which the approximate techniques fail.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Sequential Lot Sizing Heuristic with Optimal Average Performance
- Approximation Methods for the Uncapacitated Dynamic Lot Size Problem
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Lot-Sizing with Start-Up Times
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
04이후 연구
05선행 연구
- Approximation Methods for the Uncapacitated Dynamic Lot Size Problem
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 31(5) · 634–640
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.31.5.634
- 저자Sven Axsäter