Heuristics for Multilevel Lot-Sizing with a Bottleneck
Peter J. Billington, John O. McClain
인용
- 주제생산 계획과 일정 · 생산·최적화
In this paper we present a heuristic method, based on Lagrangian relaxation, for multilevel lot-sizing when there is a single bottleneck facility. A series of Lagrangian relaxations (one for each item in the product structure) is imbedded in a branch and bound procedure. The objective is to find a production schedule that fits within available capacity at minimum cost. The method has two solution phases, dual and primal. In the dual phase of the procedure, implied costs of setups and production are determined based on a tentative schedule. The primal phase is repeated with these new prices and we iterate to reach a good solution. The solution procedure is first tested on two special cases: uncapacitated multilevel lot-sizing and the capacitated, single-level multi-item lot sizing problem. The results show that the solution procedure can provide better solutions than some heuristics designed especially for those problems. Test results on the bottleneck problem indicate that good feasible solutions are found for problems too difficult to solve with exact methods.
불러오는 중…
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Lot Sizing and Sequencing for <i>N</i> Products on One Facility
- Capacitated Lot Sizing with Setup Times
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Note—Performance Bounds for Lot Sizing Heuristics
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
15 / 21편
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- A Facilities in Series Inventory Model with Nested Schedules
- Computational Complexity of the Capacitated Lot Size Problem
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Multi-Stage Production Planning
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 32(8) · 989–1006
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.32.8.989
- 저자Peter J. Billington, John O. McClain